Most shower enquiries in Malvern and the inner east come from one of two situations. Either the bathroom around the shower still works and only the shower looks dated, or water is getting out and the finishes are a symptom rather than the fault.
Those two situations produce very different scopes, timelines and levels of disruption, so the first thing worth establishing is which one you actually have. A dated but dry shower can often be upgraded within an intact bathroom. A leaking shower needs the wet-area build-up opened, and no amount of surface work will change that.
The tiling is intact, the floor drains as it should and there is no sign of moisture beyond the enclosure. Work is limited to what sits on the surface: a new screen, new tapware and outlet, a base swap where one exists, fresh silicone and joint work, and often a niche formed only if the wall can take it.
Less demolition, less dust, and the existing falls and layout set the limits. If the current shower is cramped, an upgrade will not change its footprint — that is a full bathroom renovation conversation.
Water is escaping the enclosure. Tiles come off, the base or screed comes out, damaged sheeting is replaced, a new membrane is applied and the falls are re-formed before anything is re-tiled.
It is the only sequence that addresses the cause rather than the evidence. The waterproofing stage is the whole point of the job, and the tiling that follows is what protects it.
Strip-out reference: workers remove material from an interior. Illustrative stock photography, not a completed local project.
Re-grouting, re-siliconing and sealer coats all work on the face of the tile. By the time a shower shows damp skirting, a swollen door frame or a stain on the ceiling below, water has usually passed the tile and is moving through the bed, the sheeting or a failed junction. Sealing the surface can slow the evidence without changing the path.
Three questions help sort a repair from a rebuild:
01 Isolate and protect — water off, access route covered, dust containment to the doorway.
02 Screen and tapware out — glass removed first so nothing is worked around.
03 Tile, base and screed out — removed to the point where sound material begins.
04 Substrate inspection — damaged sheeting, framing or bearers replaced before anything is covered.
05 Plumbing and rough-in — outlet heights set, mixer position confirmed, waste checked for fall.
06 Waterproofing — corners, penetrations and the waste flange detailed, then coats applied and left to cure.
07 Screed and falls — the floor shaped so water reaches the waste without ponding.
08 Tiling and detail — wall and floor set out from the niche and the waste, not the corner.
09 Screen measured — glass is measured after tiling, against the finished surface, then fabricated.
10 Fixtures, seal and clean — tapware, rail or rain head, silicone to movement joints, final check under running water.
A shower rebuild rarely stops neatly at the screen line. Removing a base or a screed usually means cutting into the bathroom floor, and matching an older tile is often not possible once a range has been discontinued. There are three honest ways forward: re-tile the whole floor while access is open, hold a deliberate threshold or border so the change reads as a design decision, or take the opportunity to go hobless with a continuous floor. We work out which one applies before demolition, not after.
07
Walk-In Showers — hobless and frameless builds
Bathroom Waterproofing — wet-area membrane work
Bathroom Tiling — wall, floor and detail
Ensuite Renovations — compact master bathrooms
Full Bathroom Renovations — strip-out to handover
All services
The projects index explains the design references and material combinations we work from, and how a shower scope is documented before work starts. Suburb pages for Malvern, Armadale, Prahran and South Yarra set out the housing stock and access conditions that shape shower work locally.
Waterproofing Guide — sequence, detail and failure
Renovation Timeline — stage by stage
What drives cost in Malvern
Renovation FAQ
All bathroom guides
Send a short description — where the water is showing, the age of the bathroom and whether the surrounding floor tile can still be matched — and we will come back on whether it reads as an upgrade or a rebuild. The enquiry form asks for your name, email, phone, suburb, renovation type, budget range, timeframe and project details. Photos can be discussed at the site visit rather than uploaded here.