A full renovation means the room comes back to bare structure. Fixtures, cabinetry, screens, tiles and old bedding are removed and carted away, then the floor and walls are checked and made good before anything new goes in.
From there the work runs in a fixed order: plumbing and electrical rough-in to suit the new layout, sheeting to wet-area board,
waterproofing with the correct primers, bond breakers and membrane coats, screeding to establish falls to the waste, then
wall and floor tiling, grouting and silicone. Fit-off follows — vanity and cabinetry, basin, mixer and tapware, toilet, shower set, screen or
hobless walk-in glazing, heated rail, mirror and lighting. The last stage is the honest one: adjust, seal, clean, walk the room together and hand over the finished space with the fixture details recorded.