Can the shower be moved in my apartment?
Sometimes, but it has to be checked rather than assumed. On a concrete slab it depends on slab thickness, where the existing waste enters the riser, whether core-drilling is permitted, and whether the required fall can be achieved without raising the floor awkwardly. That investigation belongs at the site assessment stage, before the design is fixed.
Do I need owners corporation approval?
Most buildings require notice or formal approval for wet-area work, and nearly all require it where common-property plumbing, risers or the slab are involved. We can supply the scope description and trade documentation a manager typically asks for; the decision and its timing sit with the building.
Will my water be off the whole time?
No. Isolation is normally needed for defined periods during rough-in and fit-off, arranged inside the building’s approved shutdown window and notified in advance. The rest of the program runs with services live.
Can I stay in the apartment during the works?
It depends on whether there is a second bathroom. In a single-bathroom apartment the wet area is unusable from demolition until fit-off, so many owners arrange alternative accommodation or plan the works while the apartment is vacant between tenancies.
Does an apartment bathroom take longer than a house?
Are there South Yarra projects I can look at?
We only publish case studies for work we have actually completed and documented, so a South Yarra entry may not be available yet. The
projects index shows what is currently published, and the design references used across this site are illustrative material and finish examples rather than photographs of our work.