Drawings, elevations and a written selections schedule before a single tile is ordered. The design stage is where the layout is tested, the budget is set and every finish is given a code you can point at.

SELECT  ·  SPECIFY  ·  INSTALL

People holding and comparing gray stone or tile samples over architectural plans and additional material samples.

Home  /  Services  /  Bathroom Design Malvern

Design is the cheapest place to change your mind

A bathroom design service covers everything that happens before trades arrive: a measured survey of the existing room, layout options drawn against the plumbing that is already there, elevations for every wall, a tile and fixture schedule, joinery drawings for the vanity, and a selections list where each item carries a spec code. Moving a line on a drawing costs a pencil. Moving a floor waste after the screed is poured costs a day of labour and a re-sheet.

Most Malvern bathrooms are small rooms with fixed constraints — a load-bearing wall, a stack in a known position, a window that has to stay. Design work is about finding the version of the room that respects those constraints and still gives you the shower, storage and bench you actually wanted. That documentation then travels straight into full bathroom renovations so nothing is decided on site under pressure.

01 / DELIVERABLES

What you receive at the end of design

Measured survey. Room dimensions, ceiling height, window and door positions, existing waste and stack locations, and a note on floor structure — timber or slab changes what a hobless shower requires.

Layout options. Usually two or three plans. One works with the plumbing as found, one relocates a fixture, and one tests the ambitious version so you can see the difference before pricing it.

Elevations. Every wall drawn to scale with tile setout, niche height, mixer and rail positions, mirror and light centres, and towel rail locations that don’t clash with a door swing.

Schedules. A tile schedule with formats and finishes, a fixture schedule with tapware, wastes and screens, and joinery drawings covering drawer runs, basin cut-outs and stone edge profiles.

Close-up of neutral paint or finish swatches and sample boards arranged on a design work surface.

02 / COST CONTROL

Where the budget actually locks in

Four drawing decisions carry more cost than any finish you choose later. Each one is flagged during design so the trade-off is yours, not a surprise.

What drives cost in Malvern →

D-01   Floor waste position
Keeping the waste where it is means the fall can be set in screed. Moving it means opening the floor, re-running the drain and, on a timber floor, working around joists.

D-02   Toilet relocation
A pan connector has limited tolerance. Shifting a toilet more than a short distance usually means a new soil branch, floor penetration and sometimes a bulkhead below.

D-03   Door and swing
Changing a hinged door to a cavity slider buys 800mm of usable wall but touches framing, architraves and often the adjoining room’s plaster.

D-04   Windows and light
Adding or enlarging a window affects external cladding or brickwork, waterproofing returns and the tile setout on that wall. It also changes how every material you selected reads.

03 / THE SELECTION APPOINTMENT

Eight decisions, made in one sitting

Selections are made against samples on a bench rather than from a screen. Each entry is written down with a code, a format and a next action, so ordering and site setout follow the same list.

S-01   Tile format — wall and floor sizes, finish, and whether the setout starts at the niche or the shower centre. See tile ideas.

S-02   Stone top — engineered or natural, thickness, edge profile, and whether the basin sits over or under.

S-03   Tapware finish — chrome, brushed nickel, matte black or brass, checked against the waste, rail and accessories so the room reads as one family.

S-04   Screen type — framed, semi-frameless or frameless, with hinge or channel positions fixed before tiling.

S-05   Niche — size, height above the hob or floor, tiled or stone-lined base, and its position within the tile grid.

S-06   Floor waste — linear channel or square point, tile-insert or grate, and the fall pattern it forces.

S-07   Lighting — general, mirror and shower zones, plus switch positions and the exhaust run.

S-08   Storage — drawer versus door, mirror cabinet depth, and tall units checked against the door swing. See the vanity guide.

04 / TWO DESIGN BRIEFS

Period home or contemporary extension

Matching a period Malvern home

Edwardian and interwar homes around Malvern and Armadale set their own rules: high ceilings, picture rails, timber floors with movement, and doors that were never square. Design here usually means a taller wall tile run, a skirting detail that resolves against existing architraves, and a vanity height chosen to suit the room rather than a catalogue. Traditional formats — smaller wall tiles, a shaker or fluted front, a chrome or brass finish — sit comfortably without turning the room into a reproduction.

A contemporary rear extension

New builds and rear additions allow the plumbing to be set to the design instead of the reverse. That opens up hobless shower floors, full-height tile, wall-hung joinery and concealed cisterns. The design work shifts to coordination — slab set-downs, framing for wall-hung pans, and getting the waterproofing details drawn before the frame is closed. Detail-heavy versions of this brief run through to luxury bathroom renovations.

05 / DESIGN QUESTIONS

Common design questions

Do I need a design stage if the layout stays the same?

Not always, but even a like-for-like swap benefits from a tile setout and a written selections list. It prevents mismatched finishes and last-minute substitutions.

Can I supply my own tiles and tapware?

Yes. They still need to be scheduled and checked for compatibility — mixer body depth, waste type and screen fixings all interact with what you choose.

How long does design take?

It depends on how quickly selections are confirmed and whether a layout is being changed. Documentation is not rushed, because everything after it is priced from these drawings. See the stage timeline.

Does design cover approvals?

Drawings identify where plumbing, structural or building approvals may be triggered — moving a stack, altering an external wall, or working in a strata apartment. Those requirements are flagged so they are handled before demolition.

What if the design comes back over budget?

That is the point of pricing from drawings. Scope is adjusted on paper — a different stone, a simpler screen, keeping the waste where it is — rather than mid-build. The renovation checklist covers what to settle first.

Start with the drawings

Send through your room dimensions, a few photos and what you want the finished bathroom to do. Tell us your suburb, renovation type, budget range and timeframe in the enquiry form and we will come back on how the design stage would work for your room.