Bathroom Renovations Glen Iris

Family bathrooms, upstairs ensuites and combined bathroom-laundries across postcode 3146 — the Stonnington side and the Boroondara side. Selections specified first, trades sequenced so the house stays liveable.
SELECT · SPECIFY · INSTALL
01 / THE AREA

A suburb built for families, with bathrooms to match

Glen Iris is split across two councils — the Stonnington side below Gardiners Creek and the Boroondara side above it — and the housing reads the same way from one street to the next. Interwar brick homes still carrying an original bathroom with a separate toilet next door. Post-war rear extensions where a wet area was added cheaply and never revisited. Newer townhouses with a small downstairs powder room and an upstairs ensuite sitting over timber floor framing.

Most enquiries here are for the main family bathroom rather than a showpiece. The bath usually stays because it is still being used. The layout usually improves by a few hundred millimetres in the right places rather than moving every service. Work that starts as a full bathroom renovation often absorbs the separate toilet, and frequently picks up the laundry next door in the same membrane and the same tiling run.

Where the plan needs testing before anything is ordered, bathroom design resolves fixture positions, door swings and storage on paper first. Tight rear-extension bathrooms are handled the same way as our small bathroom work — set out to the millimetre, then built.

3146

COUNCILS
Stonnington & Boroondara

TYPICAL STOCK
Interwar brick, post-war extensions, newer townhouses

COMMON SCOPE
Main bathroom with the bath retained

ADJOINS
Malvern East, Kooyong, Camberwell, Ashburton

02 / SELECTION LEDGER

Four scopes we are asked for most in Glen Iris

01   GI-01

MAIN FAMILY BATHROOM

Bath retained, shower rebuilt, tiling reset floor-to-ceiling. Where the dividing wall is non-structural, the separate toilet is absorbed into the room.

02   GI-02

UPPER-LEVEL ENSUITE

Second-storey work over timber floor framing: substrate checked and prepared, screed falls set, hobless entry only where the floor build-up allows it.

03   GI-03

BATHROOM + LAUNDRY COMBINED

Stacked or side-by-side machines under a continuous top, shared wet area, one membrane and one tiling sequence instead of two separate disruptions.

04   GI-04

MEMBRANE & WET-AREA DETAIL

Substrate prep, angle fillets, penetrations and floor waste sealed, membrane cured and checked before a single tile is laid. Non-negotiable upstairs.

03 / LIVING THROUGH IT

Renovating with children and one bathroom

In a single-bathroom Glen Iris home the real constraint is not the tiling — it is the number of mornings the family is displaced. The sequence below is how we keep that window as short as the work honestly allows, across all 12 stages of the build.
01

Everything selected before demolition

Tile format, stone top, tapware finish, screen type, niche, floor waste, lighting and storage are locked in and on site before the first wall comes off. Waiting on a back-ordered vanity with no bathroom is the most avoidable delay there is.

02

Trades booked back-to-back

Rough-in, waterproofing, screed and tiling each carry a curing or set time that cannot be argued with. What can be controlled is the gap between them, so the room is never sitting idle waiting for someone to become available.

03

A plan for the in-between days

Where a second toilet or a laundry trough exists, we stage the work so one of them stays usable for as long as possible. Where it does not, you get the honest answer at quote stage rather than a surprise on day four.

Stage detail is set out in our twelve-stage process, and realistic durations in how long a renovation takes.
Overhead view of architectural plans, stone and tile samples, a tape measure, smartphone, and a person reviewing materials.

Design reference: Overhead view of architectural plans, stone and tile samples, a tape measure, smartphone, and a person reviewing materials.

04 / KEEPING THE BATH
Reference image — finish and layout direction only, not a completed project of ours.

The bath-plus-shower family bathroom is still the most requested layout in Glen Iris, and it is the one most often compromised by a poor set-out. A freestanding bath needs clearance behind it for cleaning and in front of it for a towel rail; a shower beside it needs a screen that opens without fouling the tapware. Getting those two fixtures right usually fixes the rest of the room.

If the shower is the only element failing — leaking, dropping grout, or built to falls that never worked — it can be addressed on its own through shower renovations, or rebuilt as a walk-in shower where the floor build-up permits.

05 / LOCAL QUESTIONS

Glen Iris renovation questions

Can the separate toilet be brought into the bathroom?

Often, but it depends on two things: whether the dividing wall is carrying load, and where the existing soil connection sits. Both are checked at site assessment before the layout is drawn, so the plan you approve is one that can actually be built.

Do you work on second-storey ensuites over timber floors?

Yes. Upper-level wet areas need the substrate assessed for deflection and movement before waterproofing, and the falls formed rather than assumed. The detailing behind that work is explained in our waterproofing guide.

How do we manage with one bathroom and children?

We sequence trades so the room is worked on continuously rather than in bursts, and we tell you at quote stage which days the bathroom will genuinely be out of use. Finalising selections early is the single biggest factor in keeping that window short.

What about access and materials on a quiet residential street?

Most Glen Iris streets allow a vehicle at the kerb and a clear path through a side gate. Where the skip sits, where tiles and cabinetry are stacked, and how spoil leaves the site are all confirmed during the site assessment — not on the first morning of demolition.
06 / NEARBY AREAS

Suburbs either side of Glen Iris

07 / DESIGN REFERENCES

Projects and references

We do not publish case studies for work we cannot show. The projects index sets out the layout and material references used when planning a bathroom — formats, stone tops, tapware finishes and screen types — and is clear about what is a reference image rather than a finished job. Glen Iris entries are added there as work becomes available to show.
09 / NEXT ACTION

Get a free quote for your Glen Iris bathroom

Send the room dimensions, what stays and what goes, and roughly when you would like the work done. The enquiry form asks for your name, email, phone, suburb, renovation type, budget range, timeframe and project details — enough to give a considered response rather than a number pulled from the air. Enquiries are stored privately in this website.
Covering Glen Iris and the surrounding inner east.